or if its your first time here please scroll down and enjoy the show G42 and H220 at the depot on a sunny June 2003 morning. Russell turns 'NBW1' in readyness for the days work on the mountain. Thats the TMR workhorse H220 in the right foreground. You will see more of H220 in the next few shots.
H220 with Engineer Russell at the controls does some yard shunting to prepare the train.
Engineer Sam has left the depot with a full load and skillfully masters H220 up the TMR's 1 in 8 grade.
H220 tops the 1 in 8 . Excellent driving skills there Sam.
In this shot we see H220 with Sam at the controls and Head Ganger Savage on foot approaching bottom points.
The resident TMR track gang, Navies Russell, Sam and H220 hard at work. No rest for the wicked on the TMR.
G42 departs the depot for the mountain.
G42 entering the main line.
G42 will a full load of fill leaves bottom points. Needed lots of sand with this heavy load on the TMR's steep grades.
G42 under the masterful control of Engineer Russell arrives with the works train at Waterfall Junction.
Two foot Kasey, the TMR afternoon tea trolley and general runabout poses for a pic.
Two foot Kasey poses for a night pic at Waterfall Junction.
Two foot Kasey poses on the 1 in 8. What a showoff you are 2 foot Kasey!
Copyright © TFHL/Mark Swaby 2003 - All rights reserved
Updated 9th Dec 2003
Page uploaded June 30th, 2003