A project of the Back Yamma Landcare group

14m3 flume, 'Bellview'

contruction, 19 April 2000

upstream, with existing dam wall on S horizon
 
Mal Hayes at SE corner
looking NW
subsoil drain
removeable steel form at top edge
subsoil drain, after first pour
subsoil drain outlet only showing

downstream edge
downstream: to N

Images © 2000 David Nash

Constructed by Dept L&WC, Parkes and Back Yamma Landcare group

'Bellview' page

Created 22 April 2000 by David Nash